Wallgrove Grid Battery

The Wallgrove Grid Battery is one of a handful of batteries in the world trialling the use of synthetic inertia as a service.

logo-new.png

CLIENT

LOCATION

SERVICE

PROJECT STATUS

Iberdrola Australia

Western Sydney, NSW

Storage

Past project

About

The Wallgrove Grid Battery is the first grid-scale battery in NSW and provides the use of synthetic inertia as a network service, fully operational as of December 2022.

These network services help to stabilise the grid, and will become increasingly integral to enable the increase of renewable generation to safely connect to the grid.

As well as grid-scale synthetic inertia, the battery offers energy arbitrage and FCAS market services that are needed to optimise and firm up energy supply. Research and results from the trial will be shared to support future projects and help demonstrate that battery technology is a low cost and technically viable solution to the emerging challenge created by the transformation of the generation sector.

Iberdrola Australia has dispatch control of the battery for energy arbitrage and Frequency Control Ancillary Services (FCAS). These uses are complementary to the network services and ensure the full capacity of the battery is optimally utilised – which helps provide network services at the lowest possible cost to customers.

The battery has been designed and constructed by Tesla using Tesla Megapacks, and connected directly to Transgrid’s transmission network.

The project has received funding from ARENA as part of ARENA's Advancing Renewables Program and the NSW Government as part of the Emerging Energy Program.

The views expressed herein are not necessarily the views of the NSW Government. The NSW Government does not accept responsibility for any information or advice contained herein.

The views expressed herein are not necessarily the views of the Australian Government, and the Australian Government does not accept responsibility for any information or advice contained herein.

Key Dates

Nov 2020 - Feb 2021

Detailed design work

February 2021

Start of construction

December 2021

Start of battery commercial operations

January 2022

Completion of construction work

2022 

Testing program

December 2022

Operational

Project Benefits

Enhanced reliability

The battery will provide a new source of system stability services.

Finding lowest-cost ways to maintain frequency, while also increasing the supply of dispatchable power to the market, puts downward pressure on energy bills.

The trial will provide valuable technical and economic insights which will be shared across the energy industry – helping to identify the lowest cost technologies for future network needs.

Fact Sheet

Download our fact sheet to find out more about the Wallgrove BESS project

Wallgrove Grid Battery Fact Sheet (PDF 778.11 KB)

Contact Us

Have a question? Get in touch and someone from our team will get back to you.